Talk to a F-150 Sales Tech
1-888-706-1096
M-F 8:30A-11P, Sat-Sun 8:30A-9P
$12k Summer Sweepstakes! Enter Daily>

Ford Racing by Borla Touring Cat-Back Exhaust w/ Chrome Tips - Rear Exit (15-16 2.7L/3.5L EcoBoost)

Installation Time

1 days

Step 1: With the vehicle in NEUTRAL, position it on a hoist.


Step 2: Loosen the clamp. Torque: 35 lb.ft (48 Nm) 


Step 3: Release the locator tab out of the muffler inlet pipe.


Step 4: Remove the bolts and the muffler inlet pipe. Torque: 30 lb.ft (40 Nm) 


Step 5: Slide the muffler and tailpipe rearward out of the isolators and then forward to remove.


Step 6: Install the front muffler loosely.


Step 7: Install the proper “Mid Pipe” for your wheel base. Be sure to slip a clamp onto the pipe, clamp to be tightened later. 


Step 8: Install the short “S” pipe with hanger. Hanger to the rear of vehicle


Step 9:  Install the mid-muffler onto the hanger and slip into S-pipe. 


Step 10: From your kit find the Brackets with isolators. These will be installed onto the lower rear leaf spring shackle bolt.


Step 11: To install these hangers you will need a 21mm and a 24mm socket to loosen the lower shackle bolt without removing it. (Back shackle bolt out approximately ¼”) Slip the new hanger onto the bolt just behind the bolt head.


Step 12: Once installed be sure to torque the shackle bolt to 235 Nm (173 lb-ft). 


Step 13: Using a 15mm socket begin tightening the exhaust clamps that are installed to this point. Position the clamp bolts to the top of the pipes to avoid the potential ground clearance issues. Ensure the mid-muffler is positioned in a way that it sits parallel to the bottom of the truck.


Step 14: Locate the right side tail pipe, again be sure to slip the clamp onto the pipe prior to installing the tail pipe. Install one of the rubber exhaust isolators onto the hanger as shown in the second picture.


Step 15: Install the left side intermediate pipe and tail pipe. Slide the clamps over the pipes prior to installing.


Step 16: Align the right side tail pipe and tip and tighten.


Step 17: Align the left side tail pipe and tip and tighten. 


Step 18:  Once you are satisfied with your fitment torque all clamps to 40nm. (30 lb-ft)


Step 19: For vehicles with a 141” wheelbase. Cut 4” off front pipe. 


Step 20: For vehicles with a 122” wheelbase. Cut 23” off front pipe.