Installation Time

1 days

American Muscle
Shop Parts in this Guide

HEADER INSTALLATION

1. Disconnect Battery


2. Remove 8mm headed bolt holding engine die stick to left cylinder head and
remove dipstick tube.


3. Put truck up on jack stands or lift.


4. Remove front tires (for manifold bolt access).


5. Thru left fender well undo air tube at manifold.


6. Remove 2-13 mm headed bolts holding heat shields to transmission cross
members, and 1-13mm bolt on head pipe mount.


7. Remove 2-18mm nuts holding transmission mount to cross member.


8. Remove 6-18mm nuts (3 per side) holding cross member to frame rails.


9. Lift transmission to take weight off the cross member, slide bolts coming thru
frame rails out of cross member and pull cross member out.


10. Unhook all 4 O2 sensors.


11. Pull 4-15mm nuts off of manifolds holding head pipe on.


12. Undo hangers and drop exhaust.


13. Put cross member back in permanently


14. Remove starter: 3-13 mm bolts holding it to bell housing, 1- 13mm nut holding
battery cable, 1-10mm nut holding solenoid wire.

15. Remove 8-13mm nuts per side holding manifold to head and pull manifolds down
through the bottom.


16. If you retain the factory studs you may have to jack up motor to install headers. If
you are using bolts, headers will slide up in place from the bottom, without
jacking up motor. Make sure to install all bolts before tightening, and with bolts
installed but loose on the passenger side, go ahead and install starter, it can be
done with header tight, it is just easier with the header loose. Also install O2
extensions on wiring harness side before putting headers up in place; this will
make it much easier to get to the factory connectors.


17. Tighten all bolts.


18. Put dipstick tube back in and tighten bolt