Talk to a Ram 1500 Sales Tech
1-888-706-1096
M-F 8:30A-11P, Sat-Sun 8:30A-9P
$20K Sweeps! 10 Chances to Win! Enter Daily >

Best Sellers

How to Install Putco Black Platinum Pillar Posts on your Dodge Ram

Shop Parts in this Guide

1. Insure that the surface which the trim is to be applied is clean, dry, and free of all oil, grease and wax.


2, Prior to removing tape backing on trim piece place the front and rear pillar on the vehicle.


3. Align trim pieces so that front and rear doors are equally aligned at the top of door post.


4. With trim pieces aligned at the top remove tape backing from trim pieces and discard.


5. Apply even firm pressure for a minimum of 30 seconds


Best Sellers