Talk to a Ram 1500 Sales Tech
1-888-706-1096
M-F 8:30A-11P, Sat-Sun 8:30A-9P
$12k Summer Sweepstakes! Enter Daily>

Best Sellers

How to Install Auto Meter Full A-Pillar Gauge Pod - Dual 2-1/16 in. (10-15 RAM 1500) on your Dodge RAM

Shop Parts in this Guide

Pillar installation Directions:

Read directions before starting installation.

1) Remove Stock Pillar by removing the screw located under the cap(s) of pillar handle. (Photo 1)

2) Install Gauges in new pillar.

3) Tape or secure gauge wiring to back of pillar.  (Photo 2)  

4) Install new pillar in place of old pillar.

5) Use provided screw to hold pillar in place:  

• Make sure screw is aligned with factory hole to avoid cross threading  

• Don’t over tighten screw  (Photo 3)


Best Sellers